Kinetic Facade — Automated Louvers
AutomationIn ProgressPropretiVerified build

Kinetic Facade — Automated Louvers

Seattle, WA

Watch the Build Story

A south-facing office facade wrapped in 1,200 sensor-driven aluminum louvers that track the sun and modulate daylight — cutting cooling load roughly 30% while keeping the view glass clear.

Progress78%
Budget$2.1M
TimelineSep 2025 – Jan 2026

The chain

Every tribe on this build

Enter the Project ArenaStanding room for the verified chain — join the discussion.

Media

Site photos & documentation

Kinetic Facade — Automated Louvers media 1
Kinetic Facade — Automated Louvers media 2
Kinetic Facade — Automated Louvers media 3

Vision board

References driving the design

Parametric louver geometry studies
Parametric louver geometry studies
Daylight quality target
Daylight quality target

Zoning & permits

Powered by Propreti's zoning engine

Seattle DCI — Downtown Mixed (DMC). Facade meets energy code SEC C402; automated shading credited toward COMcheck.

  • Facade alteration permitApproved
  • Electrical (controls)Submitted
  • Energy code reviewPending

What's coming

Predicted from location, scope & typology

Controls lead timeActuator supplier quoting 6-week lead — order spares now to protect commissioning.
Energy-code incentiveSeattle utility rebate for automated shading expires end of Q4.
Seismic attachment reviewKinetic facades in DMC zones often trigger added structural review.

Access & history

Versioned, permissioned, traceable

v9 · edited yesterday by Lumen Systems
  • Lumen Systems (Automation)Owner
  • Grain Robotics (Fabrication)Editor
  • North Atelier (Design)Editor
  • Building ownerViewer

Built for place

This hub is spatial-ready

78% complete
3 tribes on site

Propreti isn't built solely for phones — it's built for place. As the world shifts to spatial computing, this project's media, collaborators, and permit data are designed to stay in view — overlaid on the real site through AR and eyewear.

Updates

Latest from the jobsite

Lumen Systems·May 30

Controls commissioning at 78% — south bank tracking live.

Grain Robotics·May 12

Final louver batch off the 5-axis. Anodizing next week.

The record

Durable evidence — kept, not simulated

Unlike the rest of this preview, entries here are written to a real database and survive refresh. Every record enters as a claim with evidence attached— never “verified” by default. Trust is earned through corroboration over time.

No evidence on the record yet.

Be the first to make a claim — it will be kept.