
MIT Kresge Auditorium — Shell Restoration
Cambridge, MA
Watch the Build StoryRestoration of Eero Saarinen's iconic thin-shell concrete dome — repairing the 1955 roof membrane, recasting weathered edge beams, and modernizing the interior acoustics without altering the landmark silhouette.
The chain
Every tribe on this build
Media
Site photos & documentation



Vision board
References driving the design
Zoning & permits
Powered by Propreti's zoning engine
Cambridge Historic District — Article 2.6. Landmark exterior; alterations require Historical Commission review.
- Historical Commission reviewApproved
- Building permit (structural)Approved
- Roof membrane variancePending
What's coming
Predicted from location, scope & typology
Access & history
Versioned, permissioned, traceable
- Joe Kain (Design)Owner
- Meridian Builders (GC)Editor
- Carrick Metalworks (Steel)Editor
- University facilitiesViewer
Built for place
This hub is spatial-ready
Propreti isn't built solely for phones — it's built for place. As the world shifts to spatial computing, this project's media, collaborators, and permit data are designed to stay in view — overlaid on the real site through AR and eyewear.
Updates
Latest from the jobsite
Edge-beam formwork complete on the north quadrant. Steel arrives Thursday.
Acoustic panel mockup approved by the university.
The record
Durable evidence — kept, not simulated
Unlike the rest of this preview, entries here are written to a real database and survive refresh. Every record enters as a claim with evidence attached— never “verified” by default. Trust is earned through corroboration over time.
Edge-beam pour passed go/no-go
Claimed by Meridian Builders · 6/12/2026
Commissioning report #4471, witnessed by site auditor
Awaiting corroboration